Saturday, March 27, 2010

Plumbing, Bushes, Etc . . .

Piping for drains is finished. Plumbers will start on water lines on Monday. 
Garage floor & Rob's grill patio get poured on Tuesday.
Heating should be installed sometime next week.

Digging holes for the sona tubes for supports for the front deck . . .

How weird does my house look with the bushes pulled out?!

Thursday, March 25, 2010

Plumbing Started . . .

Plumbers were cutting holes & running pipes today (is it weird to anyone else that the pipes are running UP into the ceiling & then down?), and my tub has been moved into place.

Lots of little plumbing parts . . .

Tub in place!

Wednesday, March 24, 2010

Progress . . .

Holes for sona tubes for decks/stair landings are being dug, as well as for Rob's grill patio. Then we need to get concrete guy to pour the garage floor, the grill patio & fill the sona tubes.

Plumber is starting tomorrow and maybe HVAC guy at end of the week.

Sunday, March 21, 2010

We have doors (well sort of) . . .

House is wrapped and mudroom doors are in, minus the hardware (figure they'll only get dirty & stuff with people working & coming in & out). Plan for next stages are: garage floor, "patio" for Rob's grills, siding, garage door and plumber starts roughing out pipes.



Monday, March 15, 2010

Addition or Ark?

It's been raining for 3 days straight & it's been a downpour - cold & windy. Thankfully, we're not getting all the flooding a lot of others are, but the windows on the side of the addition are leaking and we do have some water in the basement, but not too bad.

This is the first time, since I bought the house (1997), that I've seen the canal actually look like a canal:
 

 Our neighbors have it worse:

Wednesday, March 10, 2010

Windows are going in!

Triple window is Master Bedroom. Smaller window is Master Bath.

Wednesday, March 3, 2010

Second floor rooms are framed!

Laundry "Room" - under the stairs in mudroom
YAY! Stairs! I can go up and see the second floor!
Hallway - office at the end
Office - looking at the closet & out the door
Office - looking from door
Master Bedroom Walk-In Closet

Bathroom - Tub will go on the left, toilet on right
Bathroom - HUGE closet on left, vanity will go on right, George is standing in doorway.
Master Bedroom from Bathroom
Right when I took this picture, the wind blew in & blew through a pile of sawdust!

 




Tuesday, March 2, 2010

More walls!

Front & final outside wall went up at 8:30 am!

They're putting up the second floor interior walls, but since I don't have stairs yet, I can't take pictures yet. Robby's bedroom window has to be boarded up first, then the stringers can go in, so maybe later this afternoon, I'll be able to see what's going on upstairs.

So Rob climbed the ladder and took a few shots - I'll get up there later & take more.

This is the hallway & at the end is the office . . .

Bedroom & window to left is master bathroom . . .

The roof is done! Roofers will come Thursday to put on the shingles.

Monday, March 1, 2010

Second Floor

Despite yesterday's set back, 2 guys were able to work today, so the floor is done & the walls are going up! (1:30 pm)

Far left window is the office. The other 2 windows will be on either side of the bed in the master bedroom.

Back wall is up - Left window is the hallway at the top of the stairs, right window is the office / "Julie's room". (2:30 pm)

Other side without the peak . . . (4 pm)

And here's what the back looked like before!